TAKT Time is a concept that is used in the Lean manufacturing and production systems that refers to the maximum time it takes to manufacture a product to ensure that the needs of the customer are met. The term "TAKT" is derived from the German term "Taktzeit," meaning "cycle time" or "beat." This ensures that production is in tune with the rhythm of customer demand.
Why is TAKT Time Used?
Align Production with Customer Demand: Ensure that the production does not go above or below the requirements of the customer so that waste and overproduction are avoided.
Optimize Workflow: The consistent rhythm in production will help streamline processes and pinpoint bottlenecks.
Improve Efficiency: This encourages balanced workloads and resource utilization across the production lines so that idle time and overburden are reduced.
Enhance Flexibility: It enables fast adjustments in production rates as and when changes occur in the customer demand.
Facilitate Continuous Improvement: This baseline helps identify inefficiencies and, therefore, gives teams a direction on Lean principles, such as elimination of waste (Muda) and flow.
Related Articles
TAKT Time Example
Problem Statement Calculate the TAKT Time for the data given below. Notes Two products (SN number 10132 and SN 10321) are manufactured on this line. Product demand per month is 40/month and 60/month respectively for the next 3 months. This product is ...
TAKT time frequently asked questions
What is TAKT Time? TAKT Time is the amount of time available to produce a product to meet customer demand. It is calculated by dividing the available production time by customer demand. TAKT time ensures that production aligns with the rate at which ...
Time Series Plot Overview
A Time Series Plot is a graphical representation of data points collected or recorded at successive time intervals. It is widely used in various fields like finance, economics, weather forecasting, and business analytics to analyze trends, patterns, ...
Time Study Overview
Time Study in lean methodology is a structured process used to determine the time required for a skilled worker to complete a particular task under standard working conditions. It involves observation, measurement, and analysis of the time taken for ...
Time Study Example
Problem Statement Create a time study for the following case. The TAKT Time for this exercise is 52 sec. Process step Time 1 Time 2 Time 3 Notes Get part from the tub 8 7 10 NVA Load part onto the fixture 20 15 17 Get tape from dispenser 3 2 NVA Put ...