Variable |
Value |
Work Hours |
8 |
Breaks |
1 |
Downtime |
0.32 |
Ideal Output |
100 |
Total Output |
90 |
FTR |
84 |
Labels:
Appearance:
- Reduce the down time through better maintenance.
- Quality problems - operator training and raw material checking.
- Target constant OEE value of 85% or higher.